Moving offices? Order the circuit before the furniture.
Telecom often goes wrong when a business moves, and nobody notices until it's too late. What to ask before you sign the lease, what to list at the old site, how to handle 911 and copper lines, how to port your numbers, and what to use as a stopgap if the fiber is late.
We look at everything you pay for in phones, internet, IT and security, and tell you what to keep, what to cut and what to replace.
Call 614-224-2003. It rings Jonathan and the team.
The short version
- The internet install date at a new building is set by the provider, not by your move date. Find out before the lease is signed whether the building is already lit and by whom.
- Moving does not end your contracts. Pull every term end date at the old site first, then decide what relocates and what gets cancelled.
- Port phone numbers after the new service is tested, never before. Keep the old line live until calls ring at the new desk.
- Fire panels, elevators, alarms and the 911 location move too. They are the items that get forgotten, and the ones an inspector asks about.
- If the fiber runs late, a 5G bridge keeps the office working. Plan it in advance instead of buying it in a panic the Friday before.
The furniture shows up before the internet does
Most office moves get planned around the lease, the build-out and the movers. Telecom gets a line on the project plan that says “IT handles internet.” Then someone calls the provider six weeks out and learns the building isn’t on their network, construction needs a permit, and the landlord has to sign off on a path into the building. The move date stays put, and the install date slips.
Nobody did anything wrong there. Providers quote and build on their own schedule, and every address is different. Two buildings on the same street can have very different options, which is why one address gets a different quote than the next. The fix is to ask the right questions early, while you can still negotiate the lease and have time to get competing quotes.
This is a big part of what we do. We’ve been an independent advisor since 2003. When you buy through us, the providers pay us monthly, and the contract stays in your name. We check what each provider can deliver at the new address, and we stay on it until the phones ring in the new space.
Four questions to ask about the building first
Your landlord or broker can answer some of these. A provider check answers the rest. All four change the timeline.
Is it already lit, and by whom?
A building with fiber already in it can be a short install. One that needs construction can take months. Ask which providers are on-net at that exact address. Knowing who serves that part of town isn't enough.
Who controls the path in?
Riser space, the telecom room, the demarc and any conduit to the street usually belong to the landlord. Find out who signs the access paperwork and how long that takes in this building.
Can you get two different providers in?
If the site matters, a second provider on a different physical path is what keeps it up when a backhoe hits the first one. It is much easier to plan before the walls close.
Will the build-out allow for it?
Cabling, the network closet, power and cooling for the gear. If the space plan doesn’t include a real closet, someone will put the router on a shelf in the break room.
What to pull from the old site before anyone cancels anything
We’ve seen every item on this list missed. Keep it on one sheet with one owner.
Circuits and term dates
Every internet, private line and SD-WAN circuit, with its contract end date. Some agreements let you relocate and carry the term. Others charge early termination. Know which before you call.
Phone numbers and porting
Main lines, direct dials, toll-free and fax. Get the current account details so the port request matches. Port the numbers after the new service tests clean.
The 911 location
Multi-line phone systems are expected to send a dispatchable location with a 911 call, down to the floor or suite where it matters. Kari’s Law and RAY BAUM’S Act are the federal rules. Update it before people start working there.
Fire panel, elevator, alarm, fax
These often still ride on copper lines. They have to be moved or replaced on purpose. Our fire panel post covers what has to be in place before inspection.
Network gear and Wi-Fi
Firewalls, switches and access points. Before move week, decide what moves, what gets replaced, and who sets it up for the new circuit.
Anything billing that nobody uses
A move is a good time to catch lines and services still being billed at the old site after everyone leaves. A bill audit finds those fast.
The order that keeps the phones ringing
The dates depend on the building and the provider, but the order stays the same.
Before the lease
Check which providers serve the address and roughly how long each would take. Put any construction need in front of the landlord now.
Lease signed
Get quotes from the providers and order the primary circuit right away. Order the second path or the 5G bridge at the same time if the site can’t go dark.
Before move week
Before you move in, the circuit should be installed and tested, the network gear set up, the 911 location updated, and the copper life-safety lines moved or replaced and checked.
Move week and after
Port the numbers once the new service is proven. Keep the old site live a little longer than feels necessary. Cancel old services in writing and watch the next two bills.
How Buckeye runs the telecom side of a move
We've been an independent advisor since 2003 and we're in Ohio. We work with businesses across the US, and the Midwest is our sweet spot. Bring us in early, even before the lease is signed. The new site planning page covers what we do when a building is still being planned. We carry no products of our own. We place the best providers in each area, order the service, manage the install and handle the switch. The providers pay us, and you pay the same rate as going direct. You hold the contract in your name.
What you have
Every circuit, number, copper line and contract at the old site goes on one sheet with its end date. What can relocate, what should end, and what nobody is using anymore.
What could be better
We check what each provider can deliver at the new address and how long it will take, then put the quotes on one page. Providers pay us different rates, usually within a couple of points, and we show you what each one pays.
How we put it in
We chase install dates, coordinate the port, and stay on it through move week and the first real week in the new space. Moves, adds and changes after that come to us too.
Questions we get about moves
How early should we start telecom for an office move?
Does moving let us out of our current provider contract?
When should we port our phone numbers?
What happens to 911 when we move?
What if the fiber is not ready on move day?
What does Buckeye charge to manage the telecom side of a move?
Read next
Related reading
- Spectrum vs AT&T business internet in Columbus
- SD-WAN vs MPLS for multi-location businesses
- Columbus data center connectivity
- Your fire panel still needs a line.
- What working failover looks like for multi-location businesses
Fiber DIA vs cable: compare before you sign.
Dedicated fiber and business cable are different products. What to compare before you pick.
Read Cost controlDoes your contract auto-renew in 90 days? That's your window.
The term dates at the old site decide what the move costs you, so read them first.
Read Next stepCompare your bill
Send your bills. We quote them with all available providers and come back in 1 business day.
Compare your billSend us a bill. See what you could save.
No charge for a bill audit. The providers pay us, and you pay the same rate as going direct.