Moving Offices? Order the Circuit Before You Order the Furniture.

A new building or office move is where telecom goes wrong quietly. What to ask before the lease, what to inventory at the old site, 911 and copper lines, porting numbers, and a bridge if the fiber is late.

Rings Jonathan and the team 24x7.

7 minRead. Filed under Strategy.
2026Published October 7, 2026.
500+Clients served. 23 years in telecom.

400+ carriers and platforms, compared.

AT&TVerizonLumenSpectrumComcastCoxT-MobileFrontierZayoCogentRingCentralNextiva8x8ZoomMicrosoft TeamsWebex
CIO version

The short version

  • The internet install date at a new building is set by the carrier, not by your move date. Find out before the lease is signed whether the building is already lit and by whom.
  • Moving does not end your contracts. Pull every term end date at the old site first, then decide what relocates and what gets cancelled.
  • Port phone numbers after the new service is tested, never before. Keep the old line live until calls ring at the new desk.
  • Fire panels, elevators, alarms and the 911 location move too. They are the items that get forgotten, and the ones an inspector asks about.
  • If the fiber runs late, a 5G bridge keeps the office working. Plan it in advance instead of buying it in a panic the Friday before.

The furniture shows up. The internet doesn't.

Most office moves get planned around the lease, the build-out and the movers. Telecom gets a line on the project plan that says “IT handles internet.” Then someone calls the carrier six weeks out and learns the building isn’t on their network, construction needs a permit, and the landlord has to sign off on a path into the building. The move date doesn’t change. The install date does.

Nobody did anything wrong there. Carriers quote and build on their own schedule, and every address is different. Two buildings on the same street can have very different options, which is why one address gets a different quote than the next. The fix is to ask the right questions early, while you still have leverage on the lease and time to compete the carriers.

This is a big part of what Buckeye does. We’ve been an independent advisor since 2003. The advisory fee is $0 because the carrier pays us, and the contract stays in your name. We check what each of 400+ carriers can actually deliver at the new address, and we stay on it until the phones ring in the new space.

Before you sign

Four questions to ask about the building first

Your landlord or broker can answer some of these. A carrier check answers the rest. All four change the timeline.

01

Is it already lit, and by whom?

A building with fiber already in it can be a short install. One that needs construction can take months. Ask which carriers are on-net at that exact address, not in that part of town.

02

Who controls the path in?

Riser space, the telecom room, the demarc and any conduit to the street usually belong to the landlord. Find out who signs the access paperwork and how long that takes in this building.

03

Can you get two different carriers in?

If the site matters, a second carrier on a different physical path is what keeps it up when a backhoe hits the first one. It is much easier to plan before the walls close.

04

Will the build-out allow for it?

Cabling, the network closet, power and cooling for the gear. If the space plan doesn’t include a real closet, someone will put the router on a shelf in the break room.

Inventory

What to pull from the old site before anyone cancels anything

Every row here is something we’ve seen missed. One sheet, one owner.

01

Circuits and term dates

Every internet, private line and SD-WAN circuit, with its contract end date. Some agreements let you relocate and carry the term. Others charge early termination. Know which before you call.

02

Phone numbers and porting

Main lines, direct dials, toll-free and fax. Get the current account details so the port request matches. Port after the new service tests clean, not before.

03

The 911 location

Multi-line phone systems are expected to send a dispatchable location with a 911 call, down to the floor or suite where it matters. Kari’s Law and RAY BAUM’S Act are the federal rules. Update it before people start working there.

04

Fire panel, elevator, alarm, fax

These often still ride on copper lines. They have to be moved or replaced on purpose. Our fire panel post covers what has to be in place before inspection.

05

Network gear and Wi-Fi

Firewalls, switches and access points. Decide what moves, what gets replaced, and who configures it for the new circuit before move week, not during.

06

Anything billing that nobody uses

A move is a good time to catch lines and services still being billed at the old site after everyone leaves. A bill audit finds those fast.

Sequence

The order that keeps the phones ringing

The dates depend on the building and the carrier. The order doesn’t.

01

Before the lease

Check which carriers serve the address and roughly how long each would take. Put any construction need in front of the landlord now.

02

Lease signed

Compete the carriers and order the primary circuit right away. Order the second path or the 5G bridge at the same time if the site can’t go dark.

03

Before move week

Circuit installed and tested. Network gear configured. 911 location updated. Copper life-safety lines moved or replaced and checked.

04

Move week and after

Port the numbers once the new service is proven. Keep the old site live a little longer than feels necessary. Cancel old services in writing and watch the next two bills.

Common questions

Questions we get about moves

How early should we start telecom for an office move?
Before the lease is signed, if you can. Whether the building is already lit for fiber, and by which carriers, changes the install timeline and the price. A lit building can be a short install. A building that needs construction can take months, and the carrier sets that date, not you. Ask for the estimate in writing.
Does moving let us out of our current carrier contract?
Not by itself. Some agreements let you relocate service and carry the term to the new address. Others charge early termination for whatever is left. Pull the contracts and the term end dates for every circuit and voice service at the old site before anyone calls a carrier to cancel.
When should we port our phone numbers?
After the new service is installed and tested, not before. The port request has to match the account details on file with the current carrier, so pull those first. Keep the old service live until the numbers are confirmed working at the new address.
What happens to 911 when we move?
The 911 location tied to your phones has to change with you. Federal rules for multi-line phone systems (Kari's Law and RAY BAUM'S Act) expect direct 911 dialing and a dispatchable location, which can mean floor or suite, not just the street address. Update it before people start working in the new space.
What if the fiber is not ready on move day?
Plan a bridge. A business-grade 5G or multi-carrier wireless connection can carry a site for a while until the fiber install finishes. It is a stopgap, not the plan, but it beats an office full of people with no internet. See our mobility and 5G backup page.
What does Buckeye charge to manage the telecom side of a move?
Nothing directly. The advisory fee is $0. The carrier or platform pays us when you sign, and you pay the same price as going direct. The contract is in your name. We compare 400+ carriers and platforms, and we stay on it through install and the first week in the new space.

Moving soon? Thirty minutes now saves a dark office later.

Send us the new address. We’ll tell you who can serve it and how long it should take. No deck, no obligation. Advisory fee is $0.